Current Projects Name and Description

38th Avenue Drainage Improvement  Status: Design
Roads and Transportation - District 1
This project will provide drainage improvements along 38th Avenue at the intersection of Floral Court.

Alba Road PM 0.73 and 1.58 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of roadway settlement with large cracks and a road slipout.


Alta Via Road PM 0.42 Storm Damage Repair Project  Status: Construction

Roads and Transportation - District 5

This project will provide for the repair of a 45-lineal-foot road slipout. The project scope includes the construction of a steel soldier pile and timber lagging retaining wall, earth excavation and backfill, wall and roadway drainage systems, gabion baskets, asphalt pavement replacement, slurry seal, Midwest guardrail system with terminal end system(s), asphalt dike, erosion control and revegetation.


Aptos Village Improvements Phase II  Status: Pending Award

Roads and Transportation - District 2

Construct road and roadside improvements on Soquel Drive from Trout Gulch Road to Aptos Creek bridge to include: new traffic signal at Soquel Drive/Aptos Creek Road, new railroad crossing over Aptos Creek Road, sidewalk and bike lanes on Soquel Drive, new railroad crossing at new Parade Street.


Bean Creek Road PM 1.0 Storm Damage Repair Project  Status: Out for Bid, Construction Anticipated for Summer

Roads and Transportation - District 5
This project will provide for the repair of a 20-lineal-foot road slipout. The project scope includes the construction of a concrete crib retaining wall, installation of guard rail, road drainage facilities, and erosion control measures.


Bean Creek Road PM 2.10 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5
This project will provide for the repair of a road slipout. The project scope includes installation of soldier pile wall.


Bear Creek Road PM 0.20 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of a road embankment slipout. The project scope includes to restore eastbound travel lane and embankment with shotcrete with soil nail headwalls, rammed/mining of new culvert, new pavement, fencing, MBGR and storm drainage facilities. Replace culvert in previous location.


Bear Creek Road PM 2.12 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of a road slipout. The project scope includes to construct crib wall, structure excavation and backfill, new AC pavement and dike, guardrail, erosion control and revegetation.


Bear Creek Road PM 4.99, 7.00, 7.26 Storm Damage Repair Project  Status: Construction

Roads and Transportation - District 5
This project will provide for the repair of slipout - shoulder embankment. The project scope includes the construction a soldier pile retaining wall, underdrain, guardrail, reconstructed roadway, striping, erosion control and revegetation.


Bear Creek Road PM 8.02 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of slipout - road embankment. The project scope includes structure excavation and backfill, steel soldier pile timber lagging, anchor assembly, steel channel walers, gabion mattress energy dissipater, underdrain, midwest guardrail system, terminal end system, AC concrete and dike, erosion control and revegetation.


Blue Mountain Ridge Road Storm Damage Repair Project - CSA 23  Status: Pending Award

Roads and Transportation - District 5

This project will provide for retaining wall.  The project scope includes structure excavation and backfill, steel soldier pile timber lagging, underdrain system, metal beam guard railing, MBGR terminal system, asphalt pavement, 18" HDPE pipe, rip rap energy dissipator, erosion control & revegetation and gabion end closure structure.


Blue Ridge Drive PM 0.49 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of slipout.  The project scope includes to construct soldier pile timber lagging retaining wall with soil tieback anchor assemblies, fabricated steel walers, gabion end closures, wall underdrain system, metal beam guard railing with terminal end systems, asphalt concrete dike, asphalt pavement repair and erosion control & revegetation.


BPMP – Clean and Paint Steel Members  Status: Environmental
Roads and Transportation - District 3
This is a bridge preventative maintenance project and it will clean and paint steel bridge members of the bridges located on Swanton Road at Scott Creek (36C-032) and on Old Santa Cruz Highway at Woodwardia Sidehill Viaduct (36C-155).

BPMP – Scour Protection Project  Status: Environmental

Roads and Transportation - District 2

This is a bridge preventative maintenance project and it will provide for scour protection measures at two separate bridge sites. Site 1 is located on Spreckles Drive over Aptos Creek (Bridge # 36C-113) and Site 2 is Valencia Road over Valencia Creek (Bridge # 36C-116).


BPMP – Spall Repair  Status: Environmental

Roads and Transportation - District 5

This is a bridge preventative maintenance project and it will repair concrete spalls in the soffit and edge of deck of the bridge located on East Zayante Road at Zayante Creek (36C-142).


Branciforte Drive PM 0.92, 1.77 & 2.22 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of slipout.  The project scope includes to reconstruct, backfill, recompact, and repave, armoring along creek bank, construct soldier pile wall, reconstruct dike, A.C. dike, overside drain, erosion control and revegetation.


Browns Valley Road PM 2.14 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of slipout. The project scope includes structure excavation and backfill, repair cribwall, AC pavement and dike, metal beam guardrail, 18" HDPE culvert, downdrain, erosion control and revegetation.


Browns Valley Road PM 2.93 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of slipout.  The project scope includes to install soldier pile wall.


Buena Vista Road  Status: Pre-Design

Roads and Transportation - District

This project includes roadway rehabilitation from Highway 1 to San Andreas Road and drainage improvements to address flooding issues. This project is funded by the refuse vehicle impact fee.


Buzzard Lagoon Road PM 2.45 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of slipout. The project scope includes reconstruct roadway edge, culvert installation.


Capitola Road at Arana Gulch Emergency Storm Damage Repair  Status: Construction

Roads and Transportation - District 3

Emergency project to repair a system of two 84” diameter culverts which carry Arana Creek underneath Capitola Road. The inlet headwall has partially collapsed and the culverts are rusted out along bottom and beginning to form voids on the inlet side. The outlet headwall has completely collapsed and the roadway embankment there has washed out, leaving a large void extending beneath the sidewalk and road. Immediate action is being taken in order to restore the roadway embankment before failure of the sidewalk and roadway occurs.


Casserly Road PM 2.93 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 4

This project will provide for the repair of slipout. The project scope includes structure excavation backfill, soldier pile wall, new ac pavement and dike, guardrail, rock slope protection erosion control and revegetation.


Casserly Road PM 3.39 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 4

This project will provide for the repair of slipout. The project scope includes structure excavation and backfill, overside drain, ac pavement and dike, erosion control and revegetation.


Cathedral Drive PM 1.05 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the replacement of a failed culvert. The project scope includes structure excavation backfill, 18" HDPE culvert, concrete headwall, erosion control and revegetation.


Cathedral Drive PM 1.21 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of slipout. The project scope includes structure excavation backfill, steel soldier pile, AC dike, guardrail, erosion control and revegetation.


China Grade PM 1.84 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of slipout and culvert. The project scope includes structure excavation backfill, 18" HDPE culvert, erosion control and revegetation.


Cox Road PM 1.93 Storm Damage Repair Project  Status: Out to Bid May 14, 2020
Roads and Transportation - District 2
This project will provide for the repair of a 40-lineal-foot road slipout. The project scope includes the construction of a soldier pile retaining wall, installation of guard rail, road drainage facilities, and erosion control measures.

Cox Road PM 2.03 Storm Damage Repair Project  Status: Out to Bid April 9, 2020

Roads and Transportation - District 2

This project will provide for the repair of a 54-lineal-foot road slipout. The project scope includes the construction of a soldier pile retaining wall, guardrail, pavement replacement, striping, erosion control, revegetation and drainage improvements.


Cox Road PM 2.13 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes the construction of structure excavation backfill, steel soldier pile, AC dike, erosion control and revegetation.


East Cliff Drive at Corcoran Lagoon Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of a inboard shoulder. The project scope includes clearing and grubbing, rock slope protection, AC pavement.


East Zayante Road PM 0.59 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of a road slipout. The project scope includes 18'' HDPE culvert, concrete headwall, AC, aggregate base, erosion control and revegetation.


East Zayante Road PM 4.33 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of a road slipout. The project scope includes to replace 18'' HDPE culvert, headwalls, AC, aggregate base, rock slope protection, erosion control and revegetation.


East Zayante Road PM 5.01 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for stabilization of embankment and reconstruct travel way. The project scope includes the construction of a soldier pile wall with timber lagging.


East Zayante Road PM 6.63 Storm Damage Repair Project  Status: Out to Bid March 27, 2020

Roads and Transportation - District 5

This project will provide for the repair of a road slipout. The project scope includes the construction of a soldier pile retaining wall, underdrain, guardrail, reconstructed roadway, striping, erosion control, and revegetation.


Either Way Bridge Replacement Project  Status: Environmental

Roads and Transportation - District 5

This project will provide for the replacement of the 59-foot long Either Way Bridge over the San Lorenzo River north of the Town of Boulder Creek.


Eureka Cyn Road PM 0.36 Storm Damage Repair Project  Status: Complete

Roads and Transportation - District 2

This project will provide for the repair of a 30-lineal-foot road slipout. The project scope includes the construction of a steel soldier pile and timber lagging retaining wall requiring earth excavation and backfill, wall gutter and gutter drain system, gabion end closures, installation of Midwest guardrail system with end treatment and transition to adjacent existing metal beam guardrail, asphalt pavement replacement, slurry sealing, thermoplastic traffic striping, asphalt dike, drainage facilities, roadway embankment backfill, erosion control measures and revegetation.


Eureka Cyn Road PM 1.27 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a shoulder slipout. The project scope includes the construction of a steel soldier pile retaining wall, structure excavation and backfill, new AC pavement and dike, metal beam guardrail, erosion control and revegetation


Eureka Cyn Road PM 3.16, 3.36, 4.67, 5.05, 5.33 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a various slipouts and cracked roadway. The project scope includes excavation and backfill, tie-back soldier pile retaining wall, AC pavement and dike, midwest guardrail, erosion control and revegetation.


Eureka Cyn Road PM 8.39 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, soldier pile wall, AC pavement and dike, metal beam guardrail, erosion control and revegetation.


Felton Empire Road PM 1.4 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, soldier pile wall, AC pavement and dike, metal beam guardrail, erosion control and revegetation.


Felton Empire Road PM 1.62 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of road slipout. The project scope includes to construct concrete crib wall, structure excavation and backfill, soldier pile wall, AC pavement and dike, overside drain, metal beam guardrail and end treatments, erosion control and revegetation.


Felton Empire Road PM 2.62 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, soldier pile wall, AC pavement and dike, metal beam guardrail, erosion control and revegetation.


Felton Empire Grade PM 2.58 Storm Damage Repair Project  Status: Complete
Roads and Transportation - District 5
This project will provide for the repair of a 40-lineal-foot road slipout. The project scope includes the construction of a steel soldier pile and timber lagging retaining wall, installation of guard rail, road drainage facilities, and erosion control measures.

Fern Drive Bridge Replacement Project  Status: Design/Environmental
Roads and Transportation - District 5
This project will provide for the replacement of the 72-foot long Fern Drive Bridge over the San Lorenzo River near Boulder Creek.

Forest Hill Drive Bridge Replacement Project  Status: Design/Environmental
Roads and Transportation - District 5
This project will provide for the replacement of the 70-foot long Forest Hill Drive Bridge over Bear Creek northeast of the Town of Boulder Creek.

Gaffey Road PM 0.03 & 0.04 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 4

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, soldier pile wall, AC pavement and dike, metal beam guardrail, erosion control and revegetation.


Gaffey Road PM 0.08 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 4

This project will provide for culvert replacement. The project scope includes structure excavation and backfill, 72" HDPE culvert, AC pavement and dike, metal beam guardrail, erosion control and revegetation.


Glen Arbor Road  Status: Pre-Design
Roads and Transportation - District 5
This project includes drainage improvements and resurfacing of Glen Arbor Road from the bridge at State Highway 9 to Quail Hollow Road. This project is funded by RSTP grant funds.

Glen Haven PM 0.81 Storm Damage Repair Project  Status: Construction
Roads and Transportation - District 1
This project will provide for the repair of a 40-lineal-foot road slipout. The project scope includes the construction of a soldier pile retaining wall, installation of guard rail, road drainage facilities, and erosion control measures.

Glen Haven PM 2.27 Storm Damage Repair Project  Status: Out to Bid April 23, 2020

Roads and Transportation - District 1

This project will provide for the repair of a 100-lineal-foot road slipout. The project scope includes the construction of a soldier pile and timber lagging retaining wall with tiebacks, Midwest guardrail system, pavement reconstruction, erosion control and re-vegetation and drainage improvements.


Glenwood Cutoff PM 0.02 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of a road slipout. The project scope includes the construction of cribwall, repair existing cribwall, structure excavation and backfill, new AC pavement and dike, metal beam guardrail, erosion control and revegetation.


Glenwood Drive PM 0.35 Storm Damage Repair Project  Status: Completed
Roads and Transportation - District 5
This project will provide for the repair of a 40-lineal-foot road slipout. The project scope includes the construction of a steel soldier pile and timber lagging retaining wall, installation of guard rail, road drainage facilities, and erosion control measures.

Glenwood Drive PM 0.90 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5
This project will stabilize slope and reconstruct shoulder. The project scope includes the construction of soldier pile wall, grouted tiebacks, walers, timber lagging, MBGR, drain system, pavement repair & erosion control.


Glenwood Drive PM 2.02 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of pilewall and wall drain outlet. The project scope includes backfill the eroded slope, install erosion control and revegetation.


Glenwood Drive PM 2.60 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of concrete retaining wall. The project scope includes structure excavation and backfill, crib wall, new ac pavement and dike, striping, midwest guard rail, erosion control and revegetation.


Granite Creek Road PM 0.47 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of a road slipout. The project scope includes reconstruct over side drain, reconstruct embankment and portion of pavement.


Granite Creek Road PM 1.66 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of a road slipout. The project scope includes rock slope protection, AC dike, AC pavement, erosion control and revegetation.


Granite Creek  Road PM 2.10 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of a road slipout. The project scope includes shift roadway alignment away from creek, rock slope protection, AC dike, AC pavement, erosion control and revegetation.


Green Valley Road PM 1.85 Storm Damage Repair Project  Status: Design
Roads and Transportation - District 4
This project will provide for a culvert replacement.  

Green Valley Road Bridge Replacement Project  Status: Design/Right-of-Way

Roads and Transportation - District 2, 4
This project will provide for the replacement of the 25-foot long Green Valley Road Bridge over the Casserly Creek Tributary near Watsonville.


Grove Street Hwy 9 to Lorenzo Ave Status: Design
Roads and Transportation - District 5
This project will provide for the repair of AC, AB and subdrain pavement. The project scope includes roadway excavation, subdrain, underdrain, AC.

Grove Street and Mountain Street  Status: Complete
Roads and Transportation - District 5
This project will provide for reconstruction the structural section of storm damaged roadways and installation of drainage features.

Hazel Dell Road PM 2.00 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes structured excavation and backfill, cast-in-drilled-hole concrete piling, new AC pavement and dike, rock slope protection, erosion control and revegetation.


Hazel Dell Road PM 2.08 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes structured excavation and backfill, cast-in-drilled-hole concrete piling, new AC pavement and dike, rock slope protection, erosion control and revegetation.


Hazel Dell Road PM 2.13 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes structured excavation and backfill, construct soldier pile retaining wall; AC pavement and dike, metal beam guard rail, erosion control and revegetation.


Hazel Dell Road PM 2.16 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes roadway excavation, structure excavation and backfill, soldier pile retaining wall w/ tiebacks, new AC pavement, AC dike, 24" HDPE pipe culvert w/ outfall dissipator, erosion control and revegetation.


Hazel Dell Road PM 2.21 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes soldier pile wall, structure excavation and backfill, new AC pavement and dike, metal beam guardrail, erosion control and revegetation.


Hazel Dell Road PM 2.37 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes structured excavation and backfill, soldier pile wall, new AC pavement and dike, metal beam guard rail, erosion control and revegetation.


Hazel Dell Road PM 2.58 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes to construct tie-back soldier pile retaining wall, structure excavation and backfill, new AC pavement and dike, metal beam guardrail, rock slope protection, erosion control and revegetation.


Highland Way (at Spanish Road) Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of a road slipout. The project scope includes pile wall, culvert replacement, AC dike, AC pavement, metal beam guard rail, erosion control and revegetation.


Highland Way PM 3.16 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, steel soldier pile wall,  12'' overside drain, metal beam guard rail, AC pavement and dike, erosion control and revegetation.


Highland Way PM 3.19, PM 3.24, PM 3.73, PM 3.91, PM 5.45 Storm Damage Repair Project  Status: Pending Award
Roads and Transportation - District 1
This project will provide for the repair of multiple road slipouts. The project scope includes the construction of a soldier pile retaining walls, installation of guard rail, road drainage facilities, and erosion control measures.

Hopkins Gulch Road (1220) Storm Damage Repair Project - CSA 51  Status: Pending Award

Roads and Transportation - District 5
This project will provide for a retaining wall. The project scope includes a steel soldier pile and timber lagging retaining wall, earth excavation and backfill, stormwater drainage, asphalt pavement,  Midwest guardrail system with terminal end system(s), asphalt dike, erosion control and revegetation.

Hubbard Gulch Road PM 0.12 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, steel soldier pile wall, AC pavement and dike, erosion control and revegetation.


Hubbard Gulch Road PM 0.80 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, steel soldier pile wall, metal beam guardrails, AC pavement and dike, erosion control and revegetation.


Huntington Drive PM 0.55 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, 18" HDPE culvert, metal beam guardrails, AC pavement and dike, erosion control and revegetation.


Hwy 152/Holohan Road Intersection Improvements  Status: Design
Roads and Transportation - District 4
Construct school safety improvements for pedestrian and bike access to/from Lakeview Middle School and St. Francis High School to include: new sidewalks and bike lanes on Holohan Road and portions of Hwy 152, new pedestrian crosswalks at all approaches to the new traffic signal, widen Holohan Road to include dual left turn lanes and an exclusive right turn lane, and widen a portion of Hwy 152 to accommodate the dual left turns from Holohan Road.
Hwy 17 to Soquel Corridor  Status: Pre-Design
Roads and Transportation - District 1
This project will include resurfacing portions of Branciforte Drive, Vine Hill Road, West Vine Hill Road, Mountain View Road, North Rodeo Gulch Road, Laurel Glen Road, and Soquel San Jose Road between Highway 17 and Soquel. This project is grant funded (partially funded, seeking additional funds).

Ice Creme Grade PM 1.36 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 3

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, soldier pile wall, new AC pavement and dike, metal beam guard rail, erosion control and revegetation.


Ice Creme Grade PM 1.55 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 3

This project will provide for the repair of a road slipout. The project scope includes Geogrid Reinforced MSE Wall, structure excavation and backfill, new AC pavement and dike, metal beam guardrail, erosion control and revegetation.


Ice Cream Grade PM 1.60 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 3

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, soldier pile wall, new AC pavement and dike, metal beam guard rail, erosion control and revegetation.


Jamison Creek Road PM 0.70, PM 0.80, PM 1.09, PM 1.44 Storm Damage Repair Project  Status: Out to Bid April 9, 2020

Roads and Transportation - District 5

This project will provide for the repair of multiple road slipouts. The project scope includes the construction of soldier pile and timber lagging retaining walls, midwest guardrail system, pavement reconstruction, erosion control and re-vegetation and drainage improvements.


Jamison Creek Road PM 1.61 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of a road slipout. The project scope includes to construct a cantilever soldier pile wall, backfill the wall and reconstruct the eastbound lane, install drainage dike and wall drainage.


Jarvis Road PM 0.15 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of a road slipout. The project scope includes reconstructing the lost roadway pavement section, installing new guardrail, erosion control and revegetation.


Jarvis Road PM 0.64 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, AC pavement and dike, erosion control and revegetation.


Jarvis Road PM 1.02 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, steel soldier pile wall, rock slope protection, metal beam guard railing, AC pavement and dike, erosion control and revegetation.


Jarvis Road PM 1.04 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, underdrain, downdrain, metal beam guard railing, AC pavement and dike, erosion control and revegetation.


Jarvis Road PM 1.07 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, crib wall, underdrain, downdrain, metal beam guard railing, AC pavement and dike, erosion control and revegetation.


Jarvis Road PM 1.47 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of shifted RSP embankment. The project scope includes structure excavation and backfill, rock slope protection, downdrain, metal beam guard railing, AC pavement and dike, erosion control and revegetation.


Jarvis Road PM 1.66 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for culvert repair. The project scope includes structure excavation and backfill, 18" HDPE culvert, concrete headwall, AC pavement, erosion control and revegetation.


King Creek Rd PM 1.65 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for downdrain connection repair. The project scope includes structure excavation and backfill, downdrain, erosion control and revegetation.


King Creek Rd PM 2.28 & 3.16 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of road slipout. The project scope includes the construction of a soldier pile wall to stabilize the roadside embankment, and then construct the roadway repair behind the retaining wall, install stitch pile wall, uderdrain, AC pavement & dike, guardrail and erosion control.


King Creek Rd PM 3.03 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, steel soldier pile wall, underdrain, metal beam guard railing, AC pavement & dike, erosion control and revegetation.


La Madrona/El Rancho/Swanton Guardrail Replacement Project  Status: Design
Roads and Transportation - District 1, 3 and 5
Replace old guardrail.
La Madrona Guardrail Improvements  Status: Complete
Roads and Transportation - District 5
Install new guardrail and replace old guardrail at two locations.

Larkin Valley Road PM 4.10 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of settled roadway. The project scope includes structure excavation, AC pavement.


Laurel Road PM 1.97 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of road slipout. The project scope includes to construct soldier pile wall, excavate, backfill, reconstruct road section, AC dike, overside drain and underdrain system, install metal beam guardrail, erosion control and revegetation.


Laurel Glen Road PM 1.97 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, soldier pile wall, cold plane and overlay, HMA pavement structural section, HMA dike, guard rail and erosion control.


Little Basin Road PM 0.64 & 0.85 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of road slipout. The project scope includes to construct pier lagging wall, AC dike, drainage system, pavement repair and erosion control.


Lockhart Gulch PM 0.24 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, crib wall, underdrain, metal beam guard railing, erosion control and revegetation.


Loma Prieta Ave PM 1.06 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for pavement repair. The project scope includes structure excavation and backfill, AC pavement, erosion control and revegetation.


Loma Prieta Ave PM 2.82 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, steel soldier pile wall, underdrain, metal beam guard railing, AC pavement and dike, erosion control and revegetation.


Loma Prieta Way PM 3.33 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, steel soldier pile wall, underdrain, metal beam guard railing, AC pavement and dike, erosion control and revegetation.


Lompico Road Bridge Replacement Project  Status: Design/Environmental
Roads and Transportation - District 5
This project will provide for the replacement of the 21-foot Lompico Road Bridge over Lompico Creek north of the Town of Felton.
Lompico Road PM 0.22 Storm Damage Repair Project  Status: Construction
Roads and Transportation - District 5
This project will provide for the repair of a 100-lineal-foot road slipout. The project scope includes the construction of a soldier pile retaining wall, installation of guard rail, road drainage facilities, and erosion control measures.

Lompico Road PM 0.80 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, rock slope protection, guardrail terminal system, erosion control and revegetation.


Lompico Road PM 1.22 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, crib wall, rock slope protection, guardrail system, AC, dike, erosion control and revegetation.


Lompico Road PM 1.85 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, rock slope protection, AC pavement, erosion control and revegetation.


Lompico Road PM 2.38 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, steel soldier piles, rock slope protection, AC pavement & dike, midwest guardrail system, erosion control and revegetation.


Lorenzo Avenue Address 12415 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5
This project will provide for removal and replacement of 48" diameter CMP culvert, pavement repair & RSP.


Lower Highland Way PM 0.34 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, steel soldier piles, rock slope protection, AC pavement & dike, midwest guardrail system.


McGregor Drive PM 1.35 Storm Damage Repair Project  Status: Contract Awarded

Roads and Transportation - District 2

This project will provide for the repair of a 15-lineal-foot road slipout. The project scope includes the construction of an engineered fill / rock slope protection fill slope, reconstruct guardrail and wood posts, reconstruct roadway and HMA dike, erosion control and re-vegetation.


Measure D Projects  Status: 2019 Complete / 2020 Pending Award

Roads and Transportation

http://www.dpw.co.santa-cruz.ca.us/Home/TransportationRoads/MeasureDandSB1.aspx

2019 Measure D Resurfacing Project: This project involves resurfacing on several County roads. See project details for specific list of roads to be resurfaced. This project is being funded by Measure D sales tax revenues. Construction scheduled to start June 2019.

2020 Measure D Resurfacing Project: This project involves resurfacing on several County roads. See project details for specific list of roads to be resurfaced. This project is being funded by Measure D sales tax revenues. In Design.


Merk Rd PM 1.10 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, rock slope protection, AC pavement & dike, erosion control and revegetation.


Miller Cutoff Road PM 0.49 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, steel soldier piles, AC pavement & dike, metal beam guard railing, erosion control and revegetation.


Moosehead Drive Hainline to Stephen Rd 5 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, rock slope protection, AC pavement & dike, erosion control and revegetation.


Morrell Road PM 0.15 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of road slipout and culvert. The project scope includes structure excavation and backfill, steel soldier piles, rock slope protection, 18" & 24" HDPE culvert, metal beam guard railing, AC pavement & dike, erosion control and revegetation.


Morrell Road PM 0.50 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, retaining structure, underdrain, AC pavement & dike, erosion control and revegetation.


Morrell Road PM 1.30 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for pavement repair. The project scope includes structure excavation and backfill, AC pavement, erosion control and revegetation.


Mt. Bache Road PM 0.14 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, steel soldier piles, rock slope protection, AC pavement & dike, metal beam guard railing, erosion control and revegetation.


Mt. Charlie Road PM 0.26, 0.54, 1.35, 1.89 Storm Damage Repair Project  Status: Complete
Roads and Transportation - District 5
This project will provide for the repair of a 80-lineal-foot road slipout. The project scope includes the construction of a soldier pile retaining wall, installation of guard rail, road drainage facilities, and erosion control measures.

Mt. Charlie Road PM 3.63 Storm Damage Repair Project  Status: Design
Roads and Transportation - District 5
This project will provide for the repair of a 50-lineal-foot road slipout. The project scope includes the construction of a steel soldier pile and timber lagging retaining wall, installation of guard rail, road drainage facilities, and erosion control measures.

Mt. Madonna Rd PM 0.96 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 4

This project will provide for the repair of road slipout. The project scope includes roadway excavation and backfill, AC pavement.


Mt View Road PM 0.49 Storm Damage Repair Project  Status: Permitting
Roads and Transportation - District 1
This project will provide for the repair of a 20-lineal-foot road slipout. The project scope includes the construction of a steel soldier pile and timber lagging retaining wall, installation of guard rail, road drainage facilities, and erosion control measures.

Mountain Street E/O Hwy 9 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for pavement repair. The project scope includes roadway excavation, subdrain, AC pavement.


Nelson Road PM 0.43 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, underdrain, AC pavement & dike, metal beam guardrail, erosion control and revegetation.


Nelson Road PM 0.44 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for culvert repair. The project scope includes structure excavation and backfill, arch culvert, concrete headwall, rock slope protection, AC pavement & dike, midwest guardrail system, erosion control and revegetation.


Nelson Road PM 0.63 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for culvert repair. The project scope includes structure excavation and backfill, shoring, 36" HDPE culvert, rock slope protection, AC pavement, erosion control and revegetation.


North Rodeo Gulch Road PM 0.92 Storm Damage Repair Project  Status: Pending Award

Roads and Transportation - District 1

This project will provide for the repair of a road slipout. The project scope includes the construction of a soldier pile retaining wall, underdrain, guardrail, reconstructed roadway, striping, erosion control, and revegetation.


North Rodeo Gulch Road PM 3.82 & 4.31 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of road slipouts. The project scope includes construct tie-back soldier pile retaining wall, structure excavation and backfill, new AC pavement and dike, metal beam guardrail, rock slope protection, erosion control and revegetation.


North Rodeo Gulch Road PM 4.94 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of road slipout. The project scope includes construct tie-back soldier pile retaining wall, structure excavation and backfill, new AC pavement and dike, metal beam guardrail, rock slope protection, erosion control and revegetation.


Old Bear Creek Road PM 0.01 Storm Damage Repair Project  Status: Out to Bid April 9, 2020

Roads and Transportation - District 5

This project will provide for the repair of a road slipout. The project scope includes the construction of a soldier pile retaining wall, under drain, guardrail, reconstructed roadway, striping, erosion control, and revegetation.


Old Santa Cruz Hwy PM 1.01 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, roadway excavation, steel soldier pile, steel channel waler, under drain, metal beam guardrail, AC pavement and dike, erosion control and revegetation.


Old Santa Cruz Hwy PM 1.06 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, roadway excavation, steel soldier pile, under drain, metal beam guardrail, AC pavement and dike, erosion control and revegetation.


Old Santa Cruz Hwy PM 1.20 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, roadway excavation, steel soldier pile, steel channel waler, under drain, metal beam guardrail, AC pavement and dike, rock slope protection, erosion control and revegetation.


Old Santa Cruz Hwy PM 1.36 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of a road slipout. The project scope includes stucture excavation and backfill, roadway excavation, steel soldier pile, steel channel waler, under drain, metal beam guardrail, AC pavement and dike, erosion control and revegetation.


Paper Mill Road Address 3559 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, steel soldier pile, steel waler, under drain, rock slope protection, AC pavement and dike, erosion control and revegetation.


Paulsen Road PM 0.43 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 4

This project will provide for the repair of a road slipout and culvert. The project scope includes structure excavation and backfill, 36'' culvert, concrete headwall, energy dissipater, AC pavement and dike, erosion control and revegetation.


Peckham Road PM 0.18 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 4

This project will provide for the repair of a road slipout and culvert. The project scope includes structure excavation and backfill, ultrablock wall, AC pavement and dike, 18'' culvert, erosion control and revegetation.


Pinehurst and Greenbrier Improvements  Status: Pending with PVUSD Involvement
Roads and Transportation - District 2
This project is located in Aptos and will provide a new ADA ramp, curb, gutter and sidewalk. It will also restripe the crosswalk and fix the curb and gutter damaged by tree roots.

Pleasant Valley Road PM 0.98 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, ultrablock wall, AC pavement and dike, erosion control and revegetation.


Porter Gulch PM 0.33 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, steel soldier piles, energy dissipater, metal beam guard rail, AC pavement and dike, erosion control and revegetation.


Prescott Road PM 0.52 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, crib wall, underdrain, midwest guardrail system, AC pavement and dike, erosion control and revegetation.


Quail Hollow Road Bridge Replacement Project  Status: Utilities
Roads and Transportation - District 5
This project will provide for the replacement of the 84-foot long Quail Hollow Road Bridge over Zayante Creek, northeast of the Town of Felton.

Rancho Rio Avenue Bridge Replacement Project  Status: Design/Environmental
Roads and Transportation - District 5
This project will provide for the replacement of the 38-foot long Rancho Rio Avenue Bridge over Newell Creek in the Town of Ben Lomond.

Redwood Road PM 0.06 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2


Redwood Road PM 0.15 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, steel soldier piles, steel waler, rock slope protection, underdrain, metal beam guard railing, AC pavement and dike, erosion control and revegetation.


Redwood Road PM 0.23 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes road excavation and backfill, crib wall, underdrain, downdrain, metal beam guardrailing, AC pavement and dike, erosion control and revegetation.


Redwood Road PM 0.29, 0.31 & 0.33 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipouts and culvert repairs. The project scope includes stucture excavation and backfill, steel soldier piles, steel waler, rock slope protection, underdrain, 18" HDPE culvert, metal beam guard railing, AC pavement and dike, erosion control and revegetation.


Redwood Road PM 0.38 & 0.40 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout and ultrablock wall replacement. The project scope includes structure excavation and backfill, steel soldier piles, steel waler, rock slope protection, underdrain, metal beam guardrailing, AC pavement and dike, erosion control and revegetation.


Redwood Lodge Road PM 1.50, 1.65, & 2.02 Storm Damage Repair Project  Status: Out to Bid April 23, 2020
Roads and Transportation - District 1
This project will provide for reconstruction of storm damaged roadway and installation of drainage features.

Redwood Lodge Road PM 1.80 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of a road slipout and culvert. The project scope includes structure excavation and backfill, concrete headwall, 120'' culvert, metal beam guard rail, AC pavement and dike, erosion control and revegetation.


Redwood Road Bridge Replacement Project  Status: Complete
Roads and Transportation - District 2
This project will provide for the replacement of the 28-foot long Redwood Road Bridge over the Brown’s Creek Tributary northeast of the Town of Corralitos.

Rider Road PM 0.07 & 0.80 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, steel soldier piles, rock slope protection, underdrain, metal beam guard railing, AC pavement and dike, erosion control and revegetation.


Rider Road PM 0.38 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for downdrain repair. The project scope includes structure excavation and backfill, rock slope protection,  AC pavement and dike, erosion control and revegetation.


Rider Road PM 1.86 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, AC pavement and dike, erosion control and revegetation.


River Road - Boulder Creek PM 0.28 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for pavement repair. The project scope includes structure excavation and backfill, steel soldier piles, underdrain, metal beam guardrailing, AC pavement and dike, erosion control and revegetation.


San Andreas Road PM 1.24 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes to construct tie-back soldier pile retaining wall, structure excavation and backfill, new AC pavement and dike, metal beam guardrail, rock slope protection, erosion control and revegetation.


San Andreas Road PM 1.30 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes overside drain, structure excavation and backfill, ac pavement and dike, erosion control and revegetation.


San Andreas Road PM 2.14 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for culvert repair. The project scope includes structure excavation and backfill, open top concrete box drain, rock slope protection, 18", 24" and 36" HDPE culvert, metal beam guardrail, AC pavement and dike, erosion control and revegetation.


San Lorenzo Way Bridge Replacement Project  Status: Right of Way, Final Design
Roads and Transportation - District 5
This project will provide for the replacement of the 157-foot long San Lorenzo Way Bridge over the San Lorenzo River in the Town of Felton.

Schulties Road PM 0.51 Storm Damage Repair Project  Status: Out to bid March 26, 2020
Roads and Transportation - District 1
This project will provide for the repair of road slipout. The project scope includes the construction of a soldier pile retaining walls, installation of guard rail, road drainage facilities, and erosion control measures.

Schulties Road PM 1.14 Storm Damage Repair Project  Status: Design
Roads and Transportation - District 1
This project will provide for the repair of road slipout. The project scope includes to remove and relocate gabion wall, road excavation, reinforced retaining structure, shoring, AC pavement, erosion control and revegetation.

Schulties Road PM 1.29 Storm Damage Repair Project  Status: Design
Roads and Transportation - District 1
This project will provide for pavement and culvert repair. The project scope includes structure excavation and backfill, 18", HDPE culvert, AC pavement and dike, erosion control and revegetation.

Schulties Road PM 2.05 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for repair of road slipout. The project scope includes structure excavation and backfill, steel soldier piles, anchor assembly, steel channel walers, underdrain, metal beam guard rail, AC pavement and dike, erosion control and revegetation.


Scotts Valley Area Routes  Status: Pre-Design
Roads and Transportation
This project will include resurfacing portions of Mount Hermon Road, Lockwood Lane, and Graham Hill Road. This project is grant funded (partially funded, seeking additional funds).

Seacliff Drive PM 0.56 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for downdrain repair. The project scope includes demolition and removal of pedestrian bridge, structure excavation and backfill, 18" HDPE downdrain, concrete curb, gutter and sidewalk, pedestrian safety handrail, AC pavement, erosion control and revegetation.


Seacliff Village Streetscape Improvements  Status: Final Design
Roads and Transportation - District 2
Construct new sidewalks on State Park Drive, Santa Cruz Avenue, Broadway, and Center Avenue to include: improved pedestrian/bus facilities on State Park Drive, public plaza, ornamental streetlights, streetscape (trees and plants), wider sidewalks on Center Avenue, planted center median on Center Avenue, and improved on street parking facilities with electric vehicle charging stations.
Siesta Drive PM 0.04 Storm Damage Repair Project  Status: Design
Roads and Transportation - District 2
This project will provide for repair of road slipout. The project scope includes structure excavation and backfill, erosion control and revegetation.

Smith Grade Road PM 0.43 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 3

This project will provide for roadway repair. The project scope includes structure excavation and backfill, shoring, crib wall, underdrain, metal beam guard rail, AC pavement and dike, erosion control and revegetation.


Smith Grade Road PM 0.52 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 3

This project will provide for roadway repair. The project scope includes crib wall, underdrain system, structure backfill and excavation, AC pavement and dike, metal beam guard rail, erosion control and revegetation.


Smith Grade Road PM 2.83 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 3

This project will provide for roadway repair. The project scope includes over excavate and recompact roadway, AC dike, overside drain, gabion energy dissipater, erosion control and revegetation.


Smith Grade Road PM 4.06 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 3

This project will provide for repair of road slipout. The project scope includes construct soldier pile wall, structure excavation and backfill, new AC pavement and dike, metal beam guardrail, erosion control and revegetation.


Soquel Drive Valencia Creek (Aptos Street) Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for roadway and shoulder repair. The project scope includes construct MSE wall, structure excavation and backfill, AC pavement and dike, midwest guardrail system, erosion control and revegetation.


Soquel San Jose Road PM 3.97 and PM 5.67 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for the repair of road slipouts. The project scope includes the construction of a steel soldier pile wall, structure excavation and backfill, 12'' overside drain, new ac pavement and dike, metal beam guardrail, rock slope protection, erosion control and revegetation.


Soquel San Jose Road PM 5.91 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 1

This project will provide for repair of road slipout. The project scope includes construct retaining wall, asphalt concrete, aggregate base, imported borrow, striping, erosion control and revegetation.


Spanish Ranch Road PM 0.20 and PM 0.37 Storm Damage Repair Project  Status: Pending Award

Roads and Transportation - District 1

This project will provide for the repair of road slipouts. The project scope includes the construction of a soldier pile retaining wall, underdrain, guardrail, reconstructed roadway, striping, erosion control, and revegetation.


Spring Valley Road PM 0.18 Storm Damage Repair Project  Status: Design
Roads and Transportation - District 2
This project will provide for road repair. The project scope includes AC pavement.

Stetson Road PM 1.08 and PM 1.20 Storm Damage Repair Project  Status: Construction
Roads and Transportation - District 1
This project will provide for the repair of road slipouts. The project scope includes the construction of a soldier pile retaining walls, installation of guard rail, road drainage facilities, and erosion control measures.

Striping and Guardrail Improvements  Status: Complete
Roads and Transportation

North County – Install new guardrail, replace old guardrail, and upgrade striping on various roads.
Central County – Install new guardrail, replace old guardrail, and upgrade striping on various roads.
South County – Upgrade striping on various roads.

Swanton Road Bridge Replacement Project  Status: Design/Environmental
Roads and Transportation - District 3
This project will provide for the replacement of the 80-foot long Swanton Road Bridge over the Big Creek near the Town of Davenport.

Swanton Road PM 0.72 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 3

This project will provide for culvert replacement. The project scope includes removal of temporary bridge, temporary creek bypass system, structure excavation and backfill of arch culvert and culvert headwalls, structural concrete headwall and footing, 18" HDPE drain pipe, AC pavement and dike, metal beam guar railing, erosion control and revegetation.


Swanton Road PM 3.00 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 3

This project will provide for repair of road slipout. The project scope includes structure excavation and backfill, steel soldier piles, anchor assembly, steel channel walers, underdrain, metal beam guardrail, AC pavement and dike, erosion control and revegetation.


Trout Gulch Road PM 1.16 & 1.18 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for repair of road slipout and culvert repair. The project scope includes structure excavation and backfill, steel soldier piles, tieback assembly, steel walers, underdrain, metal beam guardrail, 18" HDPE culvert, rock slope protection, creek diversion system, AC pavement and dike, erosion control and revegetation.


Trout Gulch Road PM 1.85 & 1.90 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for repair of road slipout and culvert repair. The project scope includes structure excavation and backfill, steel soldier piles, underdrain, metal beam guardrail, tieback assembly, steel waler, 18" HDPE culvert, rock slope protection, AC pavement and dike, erosion control and revegetation.


Trout Gulch Road PM 2.36 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for repair of road slipout. The project scope includes structure excavation and backfill, underdrain, downdrain, AC pavement and dike, erosion control and revegetation.


Trout Gulch Road PM 3.03 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for repair of road slipout and culvert repair. The project scope includes roadway excavation and backfill, cribwall, underdrain, downdrain, midwest guardrail system, AC pavement and dike, erosion control and revegetation.


Two Bar Road PM 1.13 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for repair of road slipout. The project scope includes structure excavation and backfill, steel soldier piles, anchor assembly, steel channel walers, underdrain, metal beam guardrail, AC pavement and dike, erosion control and revegetation.


Upper East Zayante Road PM 1.68 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for repair of road slipout. The project scope includes structure excavation and backfill, soldier pile wall, energy dissipator, metal beam guard rail, AC pavement and dike, stabilizing uphill slope, erosion control and revegetation.


Valencia Road PM 0.04 (Trout Creek) Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for repair of roadway, embankment and culvert. The project scope includes install single lane temporary bridge, shoring, structure excavation and backfill, replace multi plate culvert with reinforced concrete box culvert, roadway excavation, AC pavement, aggregate base, erosion control and revegetation.


Valencia Road PM 0.34 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, soldier pile wall, new AC pavement and dike, stormwater drainage system, concrete barrier, guardrail system, erosion control and revegetation.

 


Valencia Road PM 2.43 Storm Damage Repair Project  Status: Pending Board approval to Advertise

Roads and Transportation - District 2

This project will provide for the repair of a road slipout. The project scope includes the construction of a soldier pile retaining wall, modification of creek wood, slope stabilization, guardrail and concrete barrier, asphalt concrete dike, reconstructed roadway, erosion control and revegetation, planting and plant establishment.


Valencia School Road PM 0.35 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for repair of road slipout. The project scope includes structure excavation and backfill, soldier pile wall, tieback assembly, steel waler, underdrain, metal beam guard rail, AC pavement and dike, erosion control and revegetation.


Valencia School Road PM 0.39 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 2

This project will provide for culvert replacement. The project scope includes structure excavation and backfill, downdrain, 60" HDPE culvert, concrete headwall,  metal beam guard rail, AC pavement and dike, erosion control and revegetation.


Vine Hill Road PM 1.18 & 1.27 Storm Damage Repair Project  Status: Pending Board approval to advertise

Roads and Transportation - District 1

This project will provide for repair of road slipout. The project scope includes structure excavation and backfill, soldier pile wall, AC pavement and dike, metal beam guardrail, slope rock protection, 24'' HDPE culvert, erosion control and revegetation.


West Park Ave PM 0.80 Storm Damage Repair Project  Status: Design

Roads and Transportation - District 5

This project will provide for repair of road and shoulder. The project scope includes structure excavation and backfill, steel soldier piles, anchor assembly, steel channel walers, energy dissipater, underdrain, AC pavement and dike, erosion control and revegetation.


Zayante Corridor  Status: Out to Bid March 27, 2020

Roads and Transportation - District 5

This project will include resurfacing a portion of East Zayante and Upper East Zayante Roads. This project is grant funded (partially funded, seeking additional funds).