Public Works Department Banner, This link takes you back to home page

Current Projects 

Current Projects Name and Description

Description coming soon.

Press Release 8/16/21

Press Release 10/1/21

Press Release 3/23/22

Press Release 3/28/22

Press Release 4/18/22

Detailed information about this project and current SCCSD project solicitations are available at the new Santa Cruz County Sanitation District (SCCSD) website at:
https://sccsd.wpcomstaging.com/construction-projects/

This project will provide construction of digouts, asphalt concrete leveling courses, rubberized cape seals, and traffic striping.

Press Release 5/12/22

The project involves tree trimming on various roads throughout the County. Work will be done under the oversight of County Road Crews.

This project will provide drainage improvements along 38th Avenue at the intersection of Floral Court.

Press Release 2/10/21

Press Release 2/23/21

Detailed information about this project and current SCCSD project solicitations are available at the new
Santa Cruz County Sanitation District (SCCSD) website at:
https://sccsd.wpcomstaging.com/construction-projects/

This project will provide for cribwall construction, structure excavation and backfill, new AC pavement and dike, metal beam guardrail, rock slope protection, erosion control and revegetation.

Press Release 3/3/21

Press Release 3/8/21

Press Release 5/12/21

Press Release 6/23/21

This project will provide for the repair of roadway settlement with large cracks and a road slipout.

This project will provide for the repair of a 45-lineal-foot road slipout. The project scope includes the construction of a steel soldier pile and timber lagging retaining wall, earth excavation and backfill, wall and roadway drainage systems, gabion baskets, asphalt pavement replacement, slurry seal, Midwest guardrail system with terminal end system(s), asphalt dike, erosion control and revegetation.

The project involves remodeling the existing main Animal Shelter building at 1001 Rodriguez Street to expand the veterinary clinic area, add cat and bunny adoption rooms, add a cat porch, and associated minor improvements.

VIRTUAL OPEN HOUSE

Aptos Branch Library Community Meeting 9/28/20 (eng)

Aptos Branch Library Community Meeting 9/28/20 (sp)

 

7695 Soquel Drive, Aptos
Aptos Branch Library Community Meeting 12/12/2019
A major renovation and possible expansion to address accessibility, upgrade building systems and enhance the user experience are planned. The Design Build method of project delivery is planned. The first step in the Design-Build process is to prepare Criteria Documents and is currently underway. The Criteria Documents are being prepared with input from the community and describe the building and library needs. This will be used as the basis of design when selecting the Design-Build team, which will include an Architect and building contractor. The Design-Build team will prepare the design, including additional community engagement, and construct the project. Construction is anticipated to begin in 2020.

Blog for Aptos Village Improvements Phase 2B project

https://tpgonlinedaily.com/soquel-dr-project-your-questions-answered/

Press Release 11/10/20

Press Release 2/19/21

Press Release 3/24/21

Press Release 5/5/22

Construct road and roadside improvements on Soquel Drive from Trout Gulch Road to Aptos Creek bridge to include: new traffic signal at Soquel Drive/Aptos Creek Road, new railroad crossing over Aptos Creek Road, sidewalk and bike lanes on Soquel Drive, new railroad crossing at new Parade Street.

This project will provide for the repair of a 20-lineal-foot road slipout. The project scope includes the construction of a concrete crib retaining wall, installation of guard rail, road drainage facilities, and erosion control measures.

This project will provide for the repair of a road slipout. The project scope includes installation of soldier pile wall.

This project will provide for the repair of a road embankment slipout. The project scope includes to restore eastbound travel lane and embankment with shotcrete with soil nail headwalls, rammed/mining of new culvert, new pavement, fencing, MBGR and storm drainage facilities. Replace culvert in previous location.

This project will provide for the repair to stabilize the unstable road embankment to prevent additional slope failure and further loss of County property and transportation along Bear Creek Road.

Press Release 8/23/21

Press Release 9/17/21

Press Release 5/2/22

Press Release 5/13/22

This project will provide for the repair of a road slipout. The project scope includes to construct crib wall, structure excavation and backfill, new AC pavement and dike, guardrail, erosion control and revegetation.

Press Release 7/9/20

This project will provide for the repair of slipout - shoulder embankment. The project scope includes the construction a soldier pile retaining wall, underdrain, guardrail, reconstructed roadway, striping, erosion control and revegetation.

This project will provide for the repair of slipout - road embankment. The project scope includes structure excavation and backfill, steel soldier pile timber lagging, anchor assembly, steel channel walers, gabion mattress energy dissipater, underdrain, midwest guardrail system, terminal end system, AC concrete and dike, erosion control and revegetation.

This project will provide for retaining wall.  The project scope includes structure excavation and backfill, steel soldier pile timber lagging, underdrain system, metal beam guard railing, MBGR terminal system, asphalt pavement, 18" HDPE pipe, rip rap energy dissipator, erosion control & revegetation and gabion end closure structure.

This project will provide for the repair of slipout.  The project scope includes to construct soldier pile timber lagging retaining wall with soil tieback anchor assemblies, fabricated steel walers, gabion end closures, wall underdrain system, metal beam guard railing with terminal end systems, asphalt concrete dike, asphalt pavement repair and erosion control & revegetation.

13390 W. Park Avenue, Boulder Creek
Boulder Creek Library Community Meeting Presentation
The Boulder Creek Library is an inviting, and well-used neighborhood branch servicing the northern San Lorenzo Valley. The Boulder Creek Library Project is primarily focused on an interior building remodel including: improvements to the central reading room to maximize the existing footprint and improve function and use of the space; renovation of the restrooms to address accessibility requirements; new carpet and paint; upgrades to the community meeting room; some updates to the building’s infrastructure; improved site lighting; an updated septic system; and new central reading room furniture. Construction will require branch closure and is planned to begin in early 2020 following opening of the new Felton Branch Library and take approximately six months to complete.

This is a bridge preventative maintenance project and it will clean and paint steel bridge members of the bridges located on Swanton Road at Scott Creek (36C-032) and on Old Santa Cruz Highway at Woodwardia Sidehill Viaduct (36C-155).

This is a bridge preventative maintenance project and it will provide for scour protection measures at two separate bridge sites. Site 1 is located on Spreckles Drive over Aptos Creek (Bridge # 36C-113) and Site 2 is Valencia Road over Valencia Creek (Bridge # 36C-116).

This is a bridge preventative maintenance project and it will repair concrete spalls in the soffit and edge of deck of the bridge located on East Zayante Road at Zayante Creek (36C-142).

Press Release 10/29/20

Press Release 6/22/21

This project will provide for the repair of slipout.  The project scope includes to reconstruct, backfill, recompact, and repave, armoring along creek bank, construct soldier pile wall, reconstruct dike, A.C. dike, overside drain, erosion control and revegetation.

This project will provide for the repair of slipout.  The project scope includes to install soldier pile wall.

The project involves the construction of a landfill gas blower and flare station to supplement the landfill gas conveyance and control system at the Santa Cruz County Buena Vista Landfill.

This project includes roadway rehabilitation from Highway 1 to San Andreas Road and drainage improvements to address flooding issues. This project is funded by the refuse vehicle impact fee.

This project will provide for the repair of slipout. The project scope includes reconstruct roadway edge, culvert installation.

Press Release 7/14/20

Detailed information about this project and current SCCSD project solicitations are available at the new
Santa Cruz County Sanitation District (SCCSD) website at:
https://sccsd.wpcomstaging.com/construction-projects/

Detailed information about this project and current SCCSD project solicitations are available at the new
Santa Cruz County Sanitation District (SCCSD) website at:
https://sccsd.wpcomstaging.com/construction-projects/

Emergency project to repair a system of two 84” diameter culverts which carry Arana Creek underneath Capitola Road. The inlet headwall has partially collapsed and the culverts are rusted out along bottom and beginning to form voids on the inlet side. The outlet headwall has completely collapsed and the roadway embankment there has washed out, leaving a large void extending beneath the sidewalk and road. Immediate action is being taken in order to restore the roadway embankment before failure of the sidewalk and roadway occurs.

This project will provide for the repair of slipout. The project scope includes structure excavation backfill, soldier pile wall, new ac pavement and dike, guardrail, rock slope protection erosion control and revegetation.

This project will provide for the repair of slipout. The project scope includes structure excavation and backfill, overside drain, ac pavement and dike, erosion control and revegetation.

This project will provide for the replacement of a failed culvert. The project scope includes structure excavation backfill, 18" HDPE culvert, concrete headwall, erosion control and revegetation.


 

Press Release 6/23/21

This project will provide for the repair of slipout. The project scope includes structure excavation backfill, steel soldier pile, AC dike, guardrail, erosion control and revegetation.


 

This project will provide for the repair of slipout and culvert. The project scope includes structure excavation backfill, 18" HDPE culvert, erosion control and revegetation.


 

Construction Notice - September 2020

Detailed information about this project and current SCCSD project solicitations are available at the new
Santa Cruz County Sanitation District (SCCSD) website at:
https://sccsd.wpcomstaging.com/construction-projects/
 

 

Press Release 5/24/21 (Neighborhood Notice)

Press Release 6/3/21

Press Release 6/10/21

Detailed information about this project and current SCCSD project solicitations are available at the new
Santa Cruz County Sanitation District (SCCSD) website at:
https://sccsd.wpcomstaging.com/construction-projects/
 

Press Release 8/7/20

Press Release 8/14/20

This project will provide for the repair of a 40-lineal-foot road slipout. The project scope includes the construction of a soldier pile retaining wall, installation of guard rail, road drainage facilities, and erosion control measures.

Press Release 9/14/20

This project will provide for the repair of a 54-lineal-foot road slipout. The project scope includes the construction of a soldier pile retaining wall, guardrail, pavement replacement, striping, erosion control, revegetation and drainage improvements.

This project will provide for the repair of a road slipout. The project scope includes the construction of structure excavation backfill, steel soldier pile, AC dike, erosion control and revegetation.

Description: The project involves the replacement of approximately 900± linear feet of sewer mains, installation of 800± linear feet of six-inch sewer mains, construction of 3-inch and 4-inch force mains, reconnect existing laterals, installation of an enhanced treatment system, wet well improvements and abandonment of existing facilities.

Vicinity Map

Neighborhood Notice 12/07/2021

 

This project will restore the roadway to its pre-disaster condition by constructing clearing and grubbing, shoulder backing, hot mix asphalt, hot mix asphalt dike, Midwest guardrail system, and terminal end systems.

This project will provide for the repair of a inboard shoulder. The project scope includes clearing and grubbing, rock slope protection, AC pavement.

Detailed information about this project and current SCCSD project solicitations are available at the new
Santa Cruz County Sanitation District (SCCSD) website at:
tinyurl.com/eastcliffdrivesewer

This project will provide for the repair of a road slipout. The project scope includes 18'' HDPE culvert, concrete headwall, AC, aggregate base, erosion control and revegetation.

This project will provide for the repair of a road slipout. The project scope includes to replace 18'' HDPE culvert, headwalls, AC, aggregate base, rock slope protection, erosion control and revegetation.

Press Release 6/23/21

This project will provide for stabilization of embankment and reconstruct travel way. The project scope includes the construction of a soldier pile wall with timber lagging.

Press Release 7/8/20

Press Release 9/9/20

This project will provide for the repair of a road slipout. The project scope includes the construction of a soldier pile retaining wall, underdrain, guardrail, reconstructed roadway, striping, erosion control, and revegetation.

This project will provide for the replacement of the 59-foot long Either Way Bridge over the San Lorenzo River north of the Town of Boulder Creek.

This project will provide for the repair of a 30-lineal-foot road slipout. The project scope includes the construction of a steel soldier pile and timber lagging retaining wall requiring earth excavation and backfill, wall gutter and gutter drain system, gabion end closures, installation of Midwest guardrail system with end treatment and transition to adjacent existing metal beam guardrail, asphalt pavement replacement, slurry sealing, thermoplastic traffic striping, asphalt dike, drainage facilities, roadway embankment backfill, erosion control measures and revegetation.

This project will provide for the repair of a shoulder slipout. The project scope includes the construction of a steel soldier pile retaining wall, structure excavation and backfill, new AC pavement and dike, metal beam guardrail, erosion control and revegetation

This project will provide for the repair of a various slipouts and cracked roadway. The project scope includes excavation and backfill, tie-back soldier pile retaining wall, AC pavement and dike, midwest guardrail, erosion control and revegetation.

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, soldier pile wall, AC pavement and dike, metal beam guardrail, erosion control and revegetation.

Gushee Street Felton
Felton Branch Library Community Meeting Presentation
Construction is complete for a new 21st Century library in Felton. The previous library services were housed in 1250 square foot Belardi Memorial Building, a church built in 1893. A new approximately 9,000 square foot library will include a children’ area, teen area, reading room, meeting/program space, with energy efficient construction to be built on a 2-acre County owned parcel on Gushee Street adjacent to the Felton Post Office. Opened on February 22, 2020.
 



Press Release 8/26/21

PM 1.40: This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, soldier pile wall, AC pavement and dike, metal beam guardrail, erosion control and revegetation.

PM 1.62: This project will provide for the repair of road slipout. The project scope includes to construct concrete crib wall, structure excavation and backfill, soldier pile wall, AC pavement and dike, overside drain, metal beam guardrail and end treatments, erosion control and revegetation.

PM 2.62: This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, soldier pile wall, AC pavement and dike, metal beam guardrail, erosion control and revegetation.

This project will provide for the repair of a 40-lineal-foot road slipout. The project scope includes the construction of a steel soldier pile and timber lagging retaining wall, installation of guard rail, road drainage facilities, and erosion control measures.

This project will provide for the replacement of the 72-foot long Fern Drive Bridge over the San Lorenzo River near Boulder Creek.

This project will provide for the replacement of the 70-foot long Forest Hill Drive Bridge over Bear Creek northeast of the Town of Boulder Creek.

Press Release 10/8/20

Press Release 10/23/20

Press Release 11/4/20

Press Release 11/30/20

Press Release 1/19/21

Press Release 2/3/21

Press Release 2/8/21

Press Release 2/23/21

Press Release 3/2/21

Press Release 3/12/21

Press Release 3/18/21

Press Release 3/18/21

Press Release 3/22/21

Press Release 4/2/21

Press Release 5/24/21

Press Release 6/1/21

Press Release 6/3/21

Press Release 7/8/21

This project involves the removal and replacement of existing sanitary sewer mains, the reconnecting of sewer laterals, lining of manholes, and replacement of manholes located at various locations within the project limits, along with appurtenant site improvements.

This project involves the removal and replacement of existing sanitary sewer mains, the reconnecting of sewer laterals, lining of manholes, and replacement of manholes located at various locations within the project limits, along with appurtenant site improvements.

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, soldier pile wall, AC pavement and dike, metal beam guardrail, erosion control and revegetation.

This project will provide for culvert replacement. The project scope includes structure excavation and backfill, 72" HDPE culvert, AC pavement and dike, metal beam guardrail, erosion control and revegetation.

This project includes drainage improvements and resurfacing of Glen Arbor Road from the bridge at State Highway 9 to Quail Hollow Road. This project is funded by RSTP grant funds.

This project will provide for the repair of a 40-lineal-foot road slipout. The project scope includes the construction of a soldier pile retaining wall, installation of guard rail, road drainage facilities, and erosion control measures.

This project will provide for the repair of a 100-lineal-foot road slipout. The project scope includes the construction of a soldier pile and timber lagging retaining wall with tiebacks, Midwest guardrail system, pavement reconstruction, erosion control and re-vegetation and drainage improvements.

This project will provide for the repair of a road slipout. The project scope includes the construction of cribwall, repair existing cribwall, structure excavation and backfill, new AC pavement and dike, metal beam guardrail, erosion control and revegetation.

This project will provide for the repair of a 40-lineal-foot road slipout. The project scope includes the construction of a steel soldier pile and timber lagging retaining wall, installation of guard rail, road drainage facilities, and erosion control measures.

This project will stabilize slope and reconstruct shoulder. The project scope includes the construction of soldier pile wall, grouted tiebacks, walers, timber lagging, MBGR, drain system, pavement repair & erosion control.

This project will provide for the repair of pilewall and wall drain outlet. The project scope includes backfill the eroded slope, install erosion control and revegetation.

This project will provide for the repair of concrete retaining wall. The project scope includes structure excavation and backfill, crib wall, new ac pavement and dike, striping, midwest guard rail, erosion control and revegetation.

This project will provide for the repair of a road slipout. The project scope includes reconstruct over side drain, reconstruct embankment and portion of pavement.

This project will provide for the repair of a road slipout. The project scope includes rock slope protection, AC dike, AC pavement, erosion control and revegetation.

This project will provide for the repair of a road slipout. The project scope includes shift roadway alignment away from creek, rock slope protection, AC dike, AC pavement, erosion control and revegetation.

This project will provide for a culvert replacement.

This project will provide for the replacement of the 25-foot long Green Valley Road Bridge over the Casserly Creek Tributary near Watsonville.

This project will provide for the repair of AC, AB and subdrain pavement. The project scope includes roadway excavation, subdrain, underdrain, AC.

This project will provide for reconstruction the structural section of storm damaged roadways and installation of drainage features.

This project will provide for the repair of a road slipout. The project scope includes a steel solider pile and ground anchor retaining walls, excavation and backfill, compact and replace travel lane pavement, drainage improvements, railing, erosion control and revegetation.

This project will provide for the repair of a road slipout. The project scope includes pile wall, culvert replacement, AC dike, AC pavement, metal beam guard rail, erosion control and revegetation.

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, steel soldier pile wall,  12'' overside drain, metal beam guard rail, AC pavement and dike, erosion control and revegetation.

Press Release 7/28/20

This project will provide for the repair of multiple road slipouts. The project scope includes the construction of a soldier pile retaining walls, installation of guard rail, road drainage facilities, and erosion control measures.

This project will provide for a retaining wall. The project scope includes a steel soldier pile and timber lagging retaining wall, earth excavation and backfill, stormwater drainage, asphalt pavement,  Midwest guardrail system with terminal end system(s), asphalt dike, erosion control and revegetation.

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, steel soldier pile wall, AC pavement and dike, erosion control and revegetation.

Press Release 5/11/21

Press Release 6/10/21

Press Release 6/16/21

Press Release 7/9/21

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, steel soldier pile wall, metal beam guardrails, AC pavement and dike, erosion control and revegetation.

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, 18" HDPE culvert, metal beam guardrails, AC pavement and dike, erosion control and revegetation.

Construct school safety improvements for pedestrian and bike access to/from Lakeview Middle School and St. Francis High School to include: new sidewalks and bike lanes on Holohan Road and portions of Hwy 152, new pedestrian crosswalks at all approaches to the new traffic signal, widen Holohan Road to include dual left turn lanes and an exclusive right turn lane, and widen a portion of Hwy 152 to accommodate the dual left turns from Holohan Road.


 

This project will include resurfacing portions of Branciforte Drive, Vine Hill Road, West Vine Hill Road, Mountain View Road, North Rodeo Gulch Road, Laurel Glen Road, and Soquel San Jose Road between Highway 17 and Soquel. This project is grant funded (partially funded, seeking additional funds).


 

This project will provide for the repair of a road slipout. The project scope includes a soldier pile retaining wall, underdrain, guardrail, reconstructed roadway, striping, erosion control and revegetation.

Press Release 7/8/20

Press Release 8/7/20

Press Release 9/16/20

This project will provide for the repair of multiple road slipouts. The project scope includes the construction of soldier pile and timber lagging retaining walls, midwest guardrail system, pavement reconstruction, erosion control and re-vegetation and drainage improvements.


 

This project will provide for the repair of a road slipout. The project scope includes to construct a cantilever soldier pile wall, backfill the wall and reconstruct the eastbound lane, install drainage dike and wall drainage.


 

This project will provide for the repair of a road slipout. The project scope includes reconstructing the lost roadway pavement section, installing new guardrail, erosion control and revegetation.


 

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, AC pavement and dike, erosion control and revegetation.


 

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, steel soldier pile wall, rock slope protection, metal beam guard railing, AC pavement and dike, erosion control and revegetation.


 

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, underdrain, downdrain, metal beam guard railing, AC pavement and dike, erosion control and revegetation.


 

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, crib wall, underdrain, downdrain, metal beam guard railing, AC pavement and dike, erosion control and revegetation.


 

This project will provide for the repair of shifted RSP embankment. The project scope includes structure excavation and backfill, rock slope protection, downdrain, metal beam guard railing, AC pavement and dike, erosion control and revegetation.


 

This project will provide for culvert repair. The project scope includes structure excavation and backfill, 18" HDPE culvert, concrete headwall, AC pavement, erosion control and revegetation.


 

The Probation Department has been awarded nearly $11 million in combined state funding for two projects at the Juvenile Hall facility in Felton by the Board of State and Community Corrections under the two Senate Bill 81 Local Youthful Offender Rehabilitative Facility Construction Financing Programs. A new 6,850 sq. ft. juvenile multi-purpose recreation building will provide indoor large muscle exercise recreation and programming space at Juvenile Hall.

The Seed-to-Table Project will provide new juvenile educational and vocational rehabilitative programming opportunities with the development of outdoor garden and greenhouse horticulture space tied to a state of the art culinary program in renovated kitchen and dining facilities. This project also includes major building renovation and upgrades to the aged Juvenile Hall facility built in 1968, such as structural, electrical, plumbing, mechanical, accessibility, security, and fire and life safety system improvements.


 

This project will provide for downdrain connection repair. The project scope includes structure excavation and backfill, downdrain, erosion control and revegetation.


 

This project will provide for the repair of road slipout. The project scope includes the construction of a soldier pile wall to stabilize the roadside embankment, and then construct the roadway repair behind the retaining wall, install stitch pile wall, uderdrain, AC pavement & dike, guardrail and erosion control.


 

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, steel soldier pile wall, underdrain, metal beam guard railing, AC pavement & dike, erosion control and revegetation.


 

Replace old guardrail.


 

Install new guardrail and replace old guardrail at two locations.


 

This project will provide for the repair of settled roadway. The project scope includes structure excavation, AC pavement.


 

316 Estrella Avenue, La Selva Beach
La Selva Beach Library Community Meeting Presentation
La Selva Beach Library Project Bid Results
The La Selva Beach Library is a small, inviting, and well-used neighborhood branch at the heart of the La Selva Beach Community. The project scope is focused on an interior building remodel including: updates to the building’s infrastructure and building envelope; improvements to the building’s interior to maximize the existing footprint and improve function and use the space for children’s and adult programming; new finishes; new furniture and public art. Improvements to the patio are also planned. Construction is planned to begin in Fall 2019 and will take approximately six months to complete. 


 

Press Release 6/14/21

This project will provide for the repair of road slipout. The project scope includes to construct soldier pile wall, excavate, backfill, reconstruct road section, AC dike, overside drain and underdrain system, install metal beam guardrail, erosion control and revegetation.


 

Press Release 3/24/22

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, soldier pile wall, cold plane and overlay, HMA pavement structural section, HMA dike, guard rail and erosion control.


 

This project will provide for the repair of road slipout. The project scope includes to construct pier lagging wall, AC dike, drainage system, pavement repair and erosion control.


 

2380 Portola Drive, Santa Cruz
The 13,500 square foot Live Oak Library opened in 2006. Some updates to the Children’s Youth and Teen areas are planned, as well as improved signage and other maintenance needs.   

979 17th Avenue, Santa Cruz
Live Oak Branch Annex Community Meeting Presentation English / Spanish
Community Meeting #4 5/28/19 7:00 - 8:00 pm
The Live Oak Library Annex at Simpkins Swim and Community Center offers the opportunity to expand access to library programming and life-long learning in the heart of Live Oak, co-located at the Simkins Swim and Community Center.
The vision for the Live Oak Library Annex is to create a community gathering and learning hub. A series of community meetings have helped shape the plans for the Annex which is proposed to include flexible program space, a classroom, study rooms, public computers and laptop bar, and a new plaza integrated into Simpkins Swim and Community Center. These improvements will support a wide range of library and enrichment programs for the benefit of the community for years to come. The project is in the planning stages with construction anticipated in 2021.


 

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, crib wall, underdrain, metal beam guard railing, erosion control and revegetation.


 

This project will provide for pavement repair. The project scope includes structure excavation and backfill, AC pavement, erosion control and revegetation.


 

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, steel soldier pile wall, underdrain, metal beam guard railing, AC pavement and dike, erosion control and revegetation.


 

This project will provide for the replacement of the 21-foot Lompico Road Bridge over Lompico Creek north of the Town of Felton.


 

This project will provide for the repair of a 100-lineal-foot road slipout. The project scope includes the construction of a soldier pile retaining wall, installation of guard rail, road drainage facilities, and erosion control measures.


 

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, rock slope protection, guardrail terminal system, erosion control and revegetation.


 

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, crib wall, rock slope protection, guardrail system, AC, dike, erosion control and revegetation.


 

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, rock slope protection, AC pavement, erosion control and revegetation.


 

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, steel soldier piles, rock slope protection, AC pavement & dike, midwest guardrail system, erosion control and revegetation.


 

Press Release 3/8/21

This project will provide for removal and replacement of 48" diameter CMP culvert, pavement repair & RSP.


 

Press Release 8/16/21

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, steel soldier piles, rock slope protection, AC pavement & dike, midwest guardrail system.

This project will provide for the repair of a 15-lineal-foot road slipout. The project scope includes the construction of an engineered fill / rock slope protection fill slope, reconstruct guardrail and wood posts, reconstruct roadway and HMA dike, erosion control and re-vegetation.


 

http://www.dpw.co.santa-cruz.ca.us/Home/TransportationRoads/MeasureDandSB1.aspx

Press Release 6/26/20

Press Release 7/23/20 (chip slurry seal)

Press Release 7/28/20 (chip slurry seal - update)

Press Release 8/6/20 (update - slurry seal schedule)

Press Release 5/11/21 (digout schedule)

Press Release 5/19/21 (scheduled work: digouts / chip seal)

Press Release 5/21/21 (revised work schedule)

Press Release 5/27/21 (revised work schedule)

Press Release 6/3/21 (revised work schedule)

Press Release 6/7/21 (revised work schedule)

Press Release 10/12/21 (slurry seal work schedule)

2019 Measure D Resurfacing Project: This project involves resurfacing on several County roads. See project details for specific list of roads to be resurfaced. This project is being funded by Measure D sales tax revenues. Construction scheduled to start June 2019.

2020/2021/2022 Measure D Resurfacing Project: This project involves resurfacing on several County roads. See project details for specific list of roads to be resurfaced. This project is being funded by Measure D sales tax revenues.


 

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, rock slope protection, AC pavement & dike, erosion control and revegetation.


 

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, steel soldier piles, AC pavement & dike, metal beam guard railing, erosion control and revegetation.


 

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, rock slope protection, AC pavement & dike, erosion control and revegetation.


 

This project will provide for the repair of road slipout and culvert. The project scope includes structure excavation and backfill, steel soldier piles, rock slope protection, 18" & 24" HDPE culvert, metal beam guard railing, AC pavement & dike, erosion control and revegetation.


 

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, retaining structure, underdrain, AC pavement & dike, erosion control and revegetation.


 

This project will provide for pavement repair. The project scope includes structure excavation and backfill, AC pavement, erosion control and revegetation.


 

Press Release 9/3/21

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, steel soldier piles, rock slope protection, AC pavement & dike, metal beam guard railing, erosion control and revegetation.

This project will provide for the repair of a 80-lineal-foot road slipout. The project scope includes the construction of a soldier pile retaining wall, installation of guard rail, road drainage facilities, and erosion control measures.


 

This project involves the construction of a timber lagging soldier pile retaining wall with tiebacks, midwest guardrail system, reconstructed roadway, erosion control and revegetation.

Press Release 4/18/22

Press Release 5/16/22

This project will provide for the repair of a 50-lineal-foot road slipout. The project scope includes the construction of a steel soldier pile and timber lagging retaining wall, installation of guard rail, road drainage facilities, and erosion control measures.


 

This project will provide for the repair of a 20-lineal-foot road slipout. The project scope includes the construction of a steel soldier pile and timber lagging retaining wall, installation of guard rail, road drainage facilities, and erosion control measures.


 

This project will provide for pavement repair. The project scope includes roadway excavation, subdrain, AC pavement.


 

This project will provide for the repair of road slipout. The project scope includes structure excavation and backfill, underdrain, AC pavement & dike, metal beam guardrail, erosion control and revegetation.


 

This project will provide for culvert repair. The project scope includes structure excavation and backfill, arch culvert, concrete headwall, rock slope protection, AC pavement & dike, midwest guardrail system, erosion control and revegetation.


 

This project will provide for culvert repair. The project scope includes structure excavation and backfill, shoring, 36" HDPE culvert, rock slope protection, AC pavement, erosion control and revegetation.


 

This project will provide for the repair of a road slipout. The project scope includes the construction of a soldier pile retaining wall, underdrain, guardrail, reconstructed roadway, striping, erosion control, and revegetation.


 

This project will provide for the repair of road slipouts. The project scope includes construct tie-back soldier pile retaining wall, structure excavation and backfill, new AC pavement and dike, metal beam guardrail, rock slope protection, erosion control and revegetation.


 

This project will provide for the repair of road slipout. The project scope includes construct tie-back soldier pile retaining wall, structure excavation and backfill, new AC pavement and dike, metal beam guardrail, rock slope protection, erosion control and revegetation.


 

Press Release 9/10/20

This project will provide for the repair of a road slipout. The project scope includes the construction of a soldier pile retaining wall, under drain, guardrail, reconstructed roadway, striping, erosion control, and revegetation.


 

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, roadway excavation, steel soldier pile, steel channel waler, under drain, metal beam guardrail, AC pavement and dike, erosion control and revegetation.


 

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, roadway excavation, steel soldier pile, under drain, metal beam guardrail, AC pavement and dike, erosion control and revegetation.


 

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, roadway excavation, steel soldier pile, steel channel waler, under drain, metal beam guardrail, AC pavement and dike, rock slope protection, erosion control and revegetation.


 

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, steel soldier pile, steel waler, under drain, rock slope protection, AC pavement and dike, erosion control and revegetation.


 

This project will provide for the repair of a road slipout and culvert. The project scope includes structure excavation and backfill, 36'' culvert, concrete headwall, energy dissipater, AC pavement and dike, erosion control and revegetation.


 

This project will provide for the repair of a road slipout and culvert. The project scope includes structure excavation and backfill, ultrablock wall, AC pavement and dike, 18'' culvert, erosion control and revegetation.


 

Press Release 10/26/21

Press Release 3/28/22

Press Release 3/30/22

Press Release 4/13/22

This project is located in Aptos and will provide a new ADA ramp, curb, gutter and sidewalk. It will also restripe the crosswalk and fix the curb and gutter damaged by tree roots.

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, ultrablock wall, AC pavement and dike, erosion control and revegetation.


 

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, steel soldier piles, energy dissipater, metal beam guard rail, AC pavement and dike, erosion control and revegetation.


 

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, crib wall, underdrain, midwest guardrail system, AC pavement and dike, erosion control and revegetation.


 

This project will provide for the replacement of the 84-foot long Quail Hollow Road Bridge over Zayante Creek, northeast of the Town of Felton.


 

This project will provide for the replacement of the 38-foot long Rancho Rio Avenue Bridge over Newell Creek in the Town of Ben Lomond.


 

 


 

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, steel soldier piles, steel waler, rock slope protection, underdrain, metal beam guard railing, AC pavement and dike, erosion control and revegetation.


 

This project will provide for the repair of a road slipout. The project scope includes road excavation and backfill, crib wall, underdrain, downdrain, metal beam guardrailing, AC pavement and dike, erosion control and revegetation.


 

This project will provide for the repair of a road slipouts and culvert repairs. The project scope includes stucture excavation and backfill, steel soldier piles, steel waler, rock slope protection, underdrain, 18" HDPE culvert, metal beam guard railing, AC pavement and dike, erosion control and revegetation.


 

This project will provide for the repair of a road slipout and ultrablock wall replacement. The project scope includes structure excavation and backfill, steel soldier piles, steel waler, rock slope protection, underdrain, metal beam guardrailing, AC pavement and dike, erosion control and revegetation.


 

This project will provide for reconstruction of storm damaged roadway and installation of drainage features.


 

This project will provide for the repair of a road slipout and culvert. The project scope includes structure excavation and backfill, concrete headwall, 120'' culvert, metal beam guard rail, AC pavement and dike, erosion control and revegetation.


 

This project will provide for the replacement of the 28-foot long Redwood Road Bridge over the Brown’s Creek Tributary northeast of the Town of Corralitos.


 

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, steel soldier piles, rock slope protection, underdrain, metal beam guard railing, AC pavement and dike, erosion control and revegetation.


 

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, steel soldier piles, rock slope protection, underdrain, metal beam guard railing, AC pavement and dike, erosion control and revegetation.


 

This project will provide for downdrain repair. The project scope includes structure excavation and backfill, rock slope protection,  AC pavement and dike, erosion control and revegetation.


 

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, AC pavement and dike, erosion control and revegetation.


 

Construction Notice - September 2020

Press Release 9/28/20

Detailed information about this project and current SCCSD project solicitations are available at the new
Santa Cruz County Sanitation District (SCCSD) website at:
https://sccsd.wpcomstaging.com/construction-projects/
 

This project will provide for pavement repair. The project scope includes structure excavation and backfill, steel soldier piles, underdrain, metal beam guardrailing, AC pavement and dike, erosion control and revegetation.

Press Release 8/12/22

Detailed information about this project and current SCCSD project solicitations are available at the new Santa Cruz County Sanitation District (SCCSD) website at: https://sccsd.wpcomstaging.com/construction-projects/

Press Release 10/20/21 (San Andreas Rd PM 1.24 & 1.30)

Press Release 10/20/21 (Mt Madonna Rd PM 0.96)

San Andreas Rd PM 1.24: This project will provide for the repair of a road slipout. The project scope includes to construct tie-back soldier pile retaining wall, structure excavation and backfill, new AC pavement and dike, metal beam guardrail, rock slope protection, erosion control and revegetation.

San Andreas Rd PM 1.30: This project will provide for the repair of a road slipout. The project scope includes overside drain, structure excavation and backfill, ac pavement and dike, erosion control and revegetation.

Browns Valley Rd PM 2.14: This project will provide for the repair of slipout. The project scope includes structure excavation and backfill, repair cribwall, AC pavement and dike, metal beam guardrail, 18" HDPE culvert, downdrain, erosion control and revegetation.

Mt Madonna Rd PM 0.96: This project will provide for the repair of road slipout. The project scope includes roadway excavation and backfill, AC pavement.

This project will provide for culvert repair. The project scope includes structure excavation and backfill, open top concrete box drain, rock slope protection, 18", 24" and 36" HDPE culvert, metal beam guardrail, AC pavement and dike, erosion control and revegetation.


 

This project will provide for the replacement of the 157-foot long San Lorenzo Way Bridge over the San Lorenzo River in the Town of Felton.


 

This project will providve for the repair of road slipout. The project scope includes the construction of a soldier pile retaining walls, installation of guard rail, road drainage facilities, and erosion control measures.


 

This project will provide for the repair of road slipout. The project scope includes to remove and relocate gabion wall, road excavation, reinforced retaining structure, shoring, AC pavement, erosion control and revegetation.


 

This project will provide for pavement and culvert repair. The project scope includes structure excavation and backfill, 18", HDPE culvert, AC pavement and dike, erosion control and revegetation.


 

This project will provide for repair of road slipout. The project scope includes structure excavation and backfill, steel soldier piles, anchor assembly, steel channel walers, underdrain, metal beam guard rail, AC pavement and dike, erosion control and revegetation.


 

Detailed information about this project and current SCCSD project solicitations are available at the new
Santa Cruz County Sanitation District (SCCSD) website at:
https://sccsd.wpcomstaging.com/construction-projects/


 

This project will include resurfacing portions of Mount Hermon Road, Lockwood Lane, and Graham Hill Road. This project is grant funded (partially funded, seeking additional funds).


 

This project will provide for downdrain repair. The project scope includes demolition and removal of pedestrian bridge, structure excavation and backfill, 18" HDPE downdrain, concrete curb, gutter and sidewalk, pedestrian safety handrail, AC pavement, erosion control and revegetation.


 

Construct new sidewalks on State Park Drive, Santa Cruz Avenue, Broadway, and Center Avenue to include: improved pedestrian/bus facilities on State Park Drive, public plaza, ornamental streetlights, streetscape (trees and plants), wider sidewalks on Center Avenue, planted center median on Center Avenue, and improved on street parking facilities with electric vehicle charging stations.


 

This project will provide for repair of road slipout. The project scope includes structure excavation and backfill, erosion control and revegetation


 

This project will provide for repair of road slipout. The project scope includes construct soldier pile wall, structure excavation and backfill, new AC pavement and dike, metal beam guardrail, erosion control and revegetation.


 

This project involves furnishing and installing In|Sync Adaptive Traffic Signal Systems, manufactured by Rhythm Engineering, at six (6) traffic signal intersections in the Soquel Area of the County of Santa Cruz.

This project will provide for roadway and shoulder repair. The project scope includes construct MSE wall, structure excavation and backfill, AC pavement and dike, midwest guardrail system, erosion control and revegetation.


 

Detailed information about this project and current SCCSD project solicitations are available at the new
Santa Cruz County Sanitation District (SCCSD) website at:
https://sccsd.wpcomstaging.com/construction-projects/

This project performs immediate rehabilitation to the 60-inch culvert preventing further failure of the roadway and anticipated future catastrophic roadway and culvert failure.

Press Release 2/11/21

This project will provide for the repair of road slipouts. The project scope includes the construction of a steel soldier pile wall, structure excavation and backfill, 12'' overside drain, new ac pavement and dike, metal beam guardrail, rock slope protection, erosion control and revegetation.


 

This project will provide for repair of road slipout. The project scope includes construct retaining wall, asphalt concrete, aggregate base, imported borrow, striping, erosion control and revegetation.


 

Detailed information about this project and current SCCSD project solicitations are available at the new
Santa Cruz County Sanitation District (SCCSD) website at:
https://sccsd.wpcomstaging.com/construction-projects/


 

This project will provide for the repair of road slipouts. The project scope includes the construction of a soldier pile retaining wall, underdrain, guardrail, reconstructed roadway, striping, erosion control, and revegetation.


 

This project will provide for road repair. The project scope includes AC pavement.


 

This project will provide for the repair of road slipouts. The project scope includes the construction of a soldier pile retaining walls, installation of guard rail, road drainage facilities, and erosion control measures.


 

North County – Install new guardrail, replace old guardrail, and upgrade striping on various roads.
Central County – Install new guardrail, replace old guardrail, and upgrade striping on various roads.
South County – Upgrade striping on various roads.


 

This project will provide for the replacement of the 80-foot long Swanton Road Bridge over the Big Creek near the Town of Davenport.


 

This project will provide for culvert replacement. The project scope includes removal of temporary bridge, temporary creek bypass system, structure excavation and backfill of arch culvert and culvert headwalls, structural concrete headwall and footing, 18" HDPE drain pipe, AC pavement and dike, metal beam guar railing, erosion control and revegetation.


 

This project will provide for repair of road slipout. The project scope includes structure excavation and backfill, steel soldier piles, anchor assembly, steel channel walers, underdrain, metal beam guardrail, AC pavement and dike, erosion control and revegetation.


 

This project will provide for repair of road slipout and culvert repair. The project scope includes structure excavation and backfill, steel soldier piles, tieback assembly, steel walers, underdrain, metal beam guardrail, 18" HDPE culvert, rock slope protection, creek diversion system, AC pavement and dike, erosion control and revegetation.


 

This project will provide for repair of road slipout and culvert repair. The project scope includes structure excavation and backfill, steel soldier piles, underdrain, metal beam guardrail, tieback assembly, steel waler, 18" HDPE culvert, rock slope protection, AC pavement and dike, erosion control and revegetation.


 

This project will provide for repair of road slipout. The project scope includes structure excavation and backfill, underdrain, downdrain, AC pavement and dike, erosion control and revegetation.


 

This project will provide for repair of road slipout. The project scope includes structure excavation and backfill, steel soldier piles, anchor assembly, steel channel walers, underdrain, metal beam guardrail, AC pavement and dike, erosion control and revegetation.


 

This project will provide for repair of road slipout. The project scope includes structure excavation and backfill, soldier pile wall, energy dissipator, metal beam guard rail, AC pavement and dike, stabilizing uphill slope, erosion control and revegetation.


 

This project will provide for repair of roadway, embankment and culvert. The project scope includes install single lane temporary bridge, shoring, structure excavation and backfill, replace multi plate culvert with reinforced concrete box culvert, roadway excavation, AC pavement, aggregate base, erosion control and revegetation.


 

Press Release 4/12/22

This project will provide for the repair of a road slipout. The project scope includes structure excavation and backfill, soldier pile wall, new AC pavement and dike, stormwater drainage system, concrete barrier, guardrail system, erosion control and revegetation.
 


 

Press Release 6/26/20

Press Release 8/14/20

Press Release 8/31/20

Press Release 9/10/20

Press Release 9/23/20

Press Release 10/26/20

Press Release 11/4/20

This project will provide for the repair of a road slipout. The project scope includes the construction of a soldier pile retaining wall, modification of creek wood, slope stabilization, guardrail and concrete barrier, asphalt concrete dike, reconstructed roadway, erosion control and revegetation, planting and plant establishment.


 

Press Release 4/12/22

This project will provide for repair of road slipout. The project scope includes structure excavation and backfill, soldier pile wall, tieback assembly, steel waler, underdrain, metal beam guard rail, AC pavement and dike, erosion control and revegetation.


 

This project will provide for culvert replacement. The project scope includes structure excavation and backfill, downdrain, 60" HDPE culvert, concrete headwall,  metal beam guard rail, AC pavement and dike, erosion control and revegetation.


 

Press Release 7/23/20

This project will provide for repair of road slipout. The project scope includes structure excavation and backfill, soldier pile wall, AC pavement and dike, metal beam guardrail, slope rock protection, 24'' HDPE culvert, erosion control and revegetation.


 

This project will provide for repair of road and shoulder. The project scope includes structure excavation and backfill, steel soldier piles, anchor assembly, steel channel walers, energy dissipater, underdrain, AC pavement and dike, erosion control and revegetation.


 

This project will include resurfacing a portion of East Zayante and Upper East Zayante Roads. This project is grant funded (partially funded, seeking additional funds).


Rev. 031721 mg trans / 062320 am all other